News

Configuration A Of MA-60 Rain-enhancing Machine Successfully Completed Research And Development And Compliance Verification Test Flight

May 13, 2024 Leave a message

Configuration A of MA-60 rain-enhancing machine successfully completed research and development and compliance verification test flight

 

Threshold wing-bar light,
China LED crossbar light,
Cheap LED crossbar light,
LED crossbar light price,
China inset aiming light.

 

 

 

新舟60增雨机A构型顺利完成研发及符合性验证试飞

 

 

At 11:41 on May 10, the MA-60 rain-intensifying machine landed smoothly at Xi'an Yanliang Airport, marking the successful completion of the research and development and compliance verification test of the rain-intensifying machine A configuration.

In order to further improve the detection level of the MA-60 rain-enhancing aircraft, in accordance with the requirements of the China Meteorological Administration, detection equipment and other mission systems were added to the aircraft platform. In order to verify the performance of the new aircraft configuration, the MA-60 rain-enhancing aircraft transferred to Suining Anju Airport in Sichuan on April 25. A joint flight test team composed of crew, design, technology, flight test technology, maintenance, project and quality personnel stationed at the same time and immediately began to engage in intense flight verification subjects.

 

news-1-1

 

This test flight mission includes two stages: R&D test flight and compliance test flight. The joint test flight team worked closely to optimize the test flight plan and completed the research and development test flight mission on April 30. Team members gave up their rest during the May Day holiday and actively prepared for the next stage of flight, and obtained the compliance verification charter flight certificate on May 6. The mission immediately entered the compliance test flight stage, and the joint test flight team conducted compliance verification tests on May 7 and 8. During this research and development and compliance verification test flight of the MA-60 rain-enhancing aircraft, a total of 8 flight test missions were completed, including stall warning, flame strips, liquid nitrogen, powder spreading, mission system function inspection and other subjects.

 

Send Inquiry